Fuse Bypass Switch; Multi-Fit Dual Mini Fuse Type; Long Lead.

Vendor : Blue Ox
Product Type : Fuse
Sku : ds_FDRW_BX88273
translation missing: en.products.product.loader_label
Size | Chest | Brand Size | Shoulder | Length | Sleeve Length |
---|---|---|---|---|---|
38 | 40.2 | 38 | 17.9 | 29.9 | 24 |
39 | 41.3 | 39 | 18.2 | 30.1 | 24.5 |
40 | 42.5 | 40 | 18.5 | 30.3 | 25 |
42 | 44.9 | 42 | 19.1 | 30.7 | 25.5 |
44 | 47.2 | 44 | 19.7 | 31.1 | 26 |
46 | 49.6 | 46 | 20.3 | 31.5 | 26.5 |
Effective Top Tube Length: Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry's standard dummy text ever since the 1500s.
Seat Tube Length: dummy text of the printing and typesetting industry when an unknown printer took a galley of type and scrambled but also the leap into electronic typesetting, remaining essentially unchanged.
Head Tube Length:Ipsum passages and more recently with desktop publishing software like Aldus PageMaker including versions.
Head Angle:Letraset sheets containing Lorem Ipsum passages, and more recently with desktop publishing software like Aldus PageMaker including versions of Lorem Ipsum.
Fork Rake (rake):It has survived not only five centuries popularised of Letraset sheets containing and more recently with desktop publishing software like Aldus PageMaker including versions.
Stand Over Height:galley of type and scrambled it to make a type specimen book. It was popularised in the 1960s with the release of Letraset sheets containing Lorem Ipsum passages.